The steel sandwich panel is covered with 0.70mm coated EPS200mm polyester foam as well as coated DX51Dmm zinc.

All the steel framing we use is S235 (accordingly EN10025:2002.)
All profiles are welded with: MIG weld, arc weld and are electrically resistant with a thickness of 0.6/0.7.

A visual check will be done in every step of the process.

The steel frame is equipped with one of the following choices:

  • 12.5 Fermacel for the stitching of the tiles or ceramics.
  • 6mm PVC punctual glued with the special polyurethane glue.
  • 4mm GRP with incorporated insertion with a tile view.

 

Maintaince free and washable.
There will be a final check in the factory for all the used parts. This check is standard and the result can be found within the POD when delivered as well as a destination tag, with your name and the correct place as to where the POD should be placed in the building.
It has been waterproof tested at 5 bar, at first for 30 minutes with a 10 minute interval at 0.5 bar and after that at 0.6 bar for 120 minutes.
This way all installations such as the toilet, the sink, the shower and the complete electronical system will be tested.
We respect the EU norms and where needed the national norms of the countries where the PODs will be placed.